West 1 Contracts Ltd:

  • About Us
  • Commercial
    • Highgate Mental Health Centre
    • 8-10 Waterloo Place, London, SW1Y 4BE
    • 7 Savoy Court
    • 67-75 Kingsway, London
    • Emerald House, Croydon, SE London
    • Golden Square, London
    • Linden House, Bracknell
    • Lushington Clifton House, Suffolk
    • Pacific House, Reading
    • Rosebury Court, Norwich
    • Coleby’s Jewellers, Billericay
    • 1st Floor, 100 Wood Street, London
  • Industrial
    • Forest Trading Estate, Walthamstow
    • London Industrial Park, Beckton
    • Units 1, 4 & 5 Western Avenue Business Park, Acton
  • External
    • Haslemere Hospital
    • St James’s Street
  • Residential
    • No 1 Hanover Street
    • Hackney, London
    • St John’s Wood
    • Flat 14, 73 St James’s Street
  • Sustainability
  • Accreditations
  • Contact Us

7 Savoy Court

7 Savoy Court is a Grade II listed building, which is adjacent to the famous Savoy Hotel built in 1889 designed by Richard D’Oyly Carte. The building offers eight floors of office space in which four have had extensive strip out works undertaken. The property is located on the south side of the Strand in the City of Westminster and is a short walk from Charing Cross station.

The client brief was to undertake a comprehensive strip out of vacated tenant office space situated over 4 floors of the occupied tenant building. Works included a complete strip out of all internal finishes including metal pan ceilings, raised access floors, toilets blocks, kitchen & tea points, walls and partitions; returning the office space to open plan layouts.

This was a particularly high level project due to the neighbouring prestigious Savoy Hotel. Special attention and responsibility was focused on the cleanliness and protection of the building’s main reception area and shared covered approach to the prominent hotel entrance. Savoy Court remained occupied throughout the construction phase programme. All noisy works were undertaken out of business hours, with material deliveries and waste removals undertaken between midnight and 7am on a daily basis, leaving the building ready for usual business by 7:30am. With careful management and planning of the construction phase, the comprehensive strip out programme of 7 weeks was achieved.

Download Case Study

Recent Projects

  • 8-10 Waterloo Place, London, SW1Y 4BE
    8-10 Waterloo Place, London, SW1Y 4BE

    8-10 Waterloo Place is a Grade II listed building located within the St. James conservation area. The building offers 5 Read more →

  • 7 Savoy Court
    7 Savoy Court

    7 Savoy Court is a Grade II listed building, which is adjacent to the famous Savoy Hotel built in 1889 Read more →

  • 67-75 Kingsway, London
    67-75 Kingsway, London

    67-75 Kingsway was constructed in the early 20th Century and comprises a mixed use development consisting of ground floor retail Read more →

  • Units 1, 4 & 5 Western Avenue Business Park, Acton
    Units 1, 4 & 5 Western Avenue Business Park, Acton

    The client brief was to provide modern open plan warehouse and office spaces, with serviced and adapted building services, Inc. Read more →

  • Pacific House, Reading
    Pacific House, Reading

    A comprehensive refurbishment programme was undertaken to provide clean open space for incoming tenants. The central atrium was re-designed, styled Read more →

  • Coleby’s Jewellers, Billericay
    Coleby’s Jewellers, Billericay

    The existing dilapidated retail unit was stripped out to shell and core, before a comprehensive three week fit-out programme was Read more →

  • Flat 14, 73 St James’s Street, Mayfair
    Flat 14, 73 St James’s Street, Mayfair

    Works included the full modernisation of services, incorporating Daikin HVAC to provide conditioned air throughout the apartment. Electrical packages included Read more →

  • 1st Floor, 100 Wood Street, London
    1st Floor, 100 Wood Street, London

    The client brief was to execute a high-end CAT A fit-out to the whole 1st floor (1,100m2), enabling a timely Read more →

Our Location

We are based in the heart of central London and Manchester;

London Office
2nd Floor, Berkeley Square House,
Berkeley Square, London, W1J 6BD

Manchester Office
2nd Floor, No.1 Spinningfields,
Quay Street,Manchester, M3 3JE

New Enquiries

We'd love to hear about your upcoming project. Tell us all about it by filling out our contact form Or phone us direct on: +44 (0) 203 300 0134

Follow Us

Want to keep up with what we are up to? Follow us on Twitter

Return to top of page

Copyright W1 Contracts Ltd© 2022·Built By AC Website Design ·Log in