The existing dilapidated retail unit was stripped out to shell and core, before a comprehensive three week fit-out programme was adopted. New ceilings and wall linings were installed throughout, together with kitchenette, new back office and front of house.
A bespoke joinery package was installed, including new reinforced glass display cabinets. A new shop frontage was installed, including entrance, signage and branding.
Comprehensive cutting edge security systems were installed as part of the project, together with a full re-wire and design lighting package.
The project was executed under an accelerated programme to ensure the launch date stayed as forecast.